Getting things in high gear: This morning I stopped in to see what was going on in the finish production of our home. The painters were patching and sanding and prepping the interior trim molding prior to painting this week. The contractor was making the final decisions (with my help) on the design of the banister rail and newel post placement. Mr. Alarm guy was there finishing up the alarm system (and I thought he was done weeks ago). Mr. Cabinet guy was there inspecting the bead board interior of a kitchen cabinet that was replaced with the correct finish ... and adding the wooden shelves that have cutouts for future inset glass in said cabinet. I was informed that the granite people would be replacing the kitchen sink & counter top since it was a breach in their own policy that caused the wrong sink to be installed in the first place. DH was not pleased with the oversight nor was the contractor. It really was a pathetic sink as one side was not even big enough for more than a few cups and small saucers to rest inside of it. I have a similar sink in our rental and have had glass bowls and pots actually get quite stuck and this sink is even smaller. So I consented to having it replaced after saying I'd live with it. Hey, when you're paying this kind of money and someone else messes up like that, they should make it right, right?? Our master bathroom floor is installed and the shower is 3/4's tiled. With only three weeks until our agreed upon move-in date, things are happening fast.

Photos: Sink in question, tile in M/B shower, hickory floor, granite counter in M/bath

Popular posts from this blog

Modern Family Rooms

Coastal Gulf Cabins: Close By

Modern Family Rooms